一般社団法人 日本ガーデンデザイナー協会 › フォーラム › 相談室フォーラム › Modular arts installation instructions
- このトピックは空です。
-
投稿者投稿
-
Anna
ゲストModular arts installation instructions
.
.
Download / Read Online Modular arts installation instructions
.
.
..
Note: Modular Arts designs are protected by registered copyrights and may not be duplicated. Attempts to copy or closely mimic Modular Arts original designs will be considered a violation of intellectual property rights and will be duly pursued. B. Installation Kit: Installation instructions.
filexlib. This revolutionary system utilizes a large-format modular panel system to create infinite design possibilities with ease. Efficient installation with minimal waste; Minimal disruption for property owner; Easily added to existing projects; Easily affix panels together with the provided stainless steel hardware.
mineral profile paneling modular arts, inc. correspondence & billing address: 2400 nw 80th st, #106 coordinate following paragraph with 2.2 b. retain if installation kit is specified in 2.2 b. delete if installation kit is not specified. to the profile panel manufacturer’s instructions for finishing seams and cross reference to this
Canamould is proud to be working with modulararts® to bring InterlockingRock® Tiles to our customers. These high quality wall tiles are a truly unique way to finish a wall with a texture that truly stands out. Residential feature walls, back-splashes, hotel room accents—where the viewer is in closer proximity to the product—are all
Section Includes: Modular screen wall blocks, footings, and installation kit to create a monolithic sculptural screen wall. COORDINATE FOLLOWING PARAGRAPH WITH 2.2 D. RETAIN IF INSTALLATION KIT IS SPECIFIED IN 2.2 D. DELETE IF INSTALLATION KIT IS NOT SPECIFIED. Products Supplied But Not Installed/Used Under This Section: Installation kit.
INSTALLATION MODULAR ARTS INSTALLATION INSTRUCTIONS COVER NORMAL INSTALLATION CONDITIONS. UNUSUAL CONDITIONS MAY REQUIRE ADDITIONAL INFORMATION IN THIS ARTICLE. A. Install profile paneling in accordance with Manufacturer’s Installation Instructions except that seam finishing shall be performed under Section 09 29 00-Gypsum Board.
To perform the installation of modularArts panels, we recommend that a finish carpenter or millworker mount and edge-glue the panels, and a drywall tradesperson address the seams. One man-hour per panel should be allowed to bring the installation to a paint-ready state. Drying time of adhesive is not included. Adhesive requires 24 hours to dry.
Installation Manual for MEJS – techstar-inc.com
We filled the panel seams with two coats of a dry-mix spackling compound provided with the installation kit. We used the same material to fill the miters on the outside corner. A flexible application tool also included in the kit made it easier to apply compound over the uneven pattern. Assembly Instructions Assembly instructions for our furniture products are available for you to download. If these instructions do not match your product, or you are unable to find the information you need, please call customer service at 1.888.779.5176. Assembly instructions are in pdf format.
Builder’s Guide to Modular Set-Up & Installation 5 site preparation & site directions 11. Foundation alignment is then checked and adjusted as necessary. 12. The second module is nailed and the units are then bolted together, using 1/2″ through-bolts. 13. The come-alongs are removed from floor area and the rails are lagged to the lolly
Each box contains (12) tiles (or about 22 sq ft). In Stock International Shipping: Purchaser is responsible for all duties, fees, and taxes levied by customs agencies. Installation Instructions Product Cut Sheet (PDF) Questions? Contact us at 206.788.4210 or info@modulararts.com. See our large scale Dune™ PANELS TILE CALCULATOR
Each box contains (12) tiles (or about 22 sq ft). In Stock International Shipping: Purchaser is responsible for all duties, fees, and taxes levied by customs agencies. Installation Instructions Product Cut Sheet (PDF) Questions? Contact us at 206.788.4210 or info@modulararts.com. See our large scale Dune™ PANELS TILE CALCULATOR
Modular Arts, Inc. CORRESPONDENCE & BILLING ADDRESS: 2400 NW 80TH ST, #106 Seattle, WA 98117 3. 09 91 23-Interior Painting: Sealing and painting of modular screen wall. 4. 26 51 00-Interior Lighting. specifications and installation instructions. 1.5. ACTION SUBMITTALS.
Modular arts installation handbog
Modular arts installation handbook
Modular arts installation manuaalinen
Modular arts installation owner manual
Modular arts installation guide -
投稿者投稿

